The Council and Four Seasons entered into a building contract that included an arbitration clause. A dispute arose between the parties and the dispute was referred to arbitration. An attempt by the Council to stay the arbitration was unsuccessful...
PRICE(AUD$): FREE
Electronic Industries Ltd (‘Electronic’) entered into a contract with David Jones Ltd (‘David Jones’) for the installation of television equipment and to give demonstrations of television for 12 days to provide an attraction which would draw customers to the store. Before the commencement date the parties had fixed, a serious coal strike began in New South Wales, which resulted in a considerable falling off in the number of shoppers coming into the city...
PRICE(AUD$): FREE
Markham was the arbitrator of a building dispute between Elspan and Eurocopter. Elspan claimed that the arbitrator’s award should be set aside on the ground that the arbitrator was guilty of misconduct...
PRICE(AUD$): FREE
Energetech Australia Pty Ltd (‘Energetech’) entered into a construction contract with Sides Engineering Pty Ltd (‘Sides’) whereby Sides undertook to carry out construction work for Energetech...
PRICE(AUD$): FREE
EnergyAustralia (“EA”) and Downer Construction (Australia) Pty Ltd (“Downer”) entered into a design and construction contract for a 132kV cable tunnel from a point in the south-western part of the city of Sydney to Surry Hills...
PRICE(AUD$): FREE

Resources

    Casewatch List
    Published Papers
 
Home  |   Firm Profile   |    Services   |  Member Registration   |  Member Login   |  Contact Us   |  Site Map   |  Privacy Policy
ALL Copyright Reserved: Doyles Construction Lawyers 2007